LOTOS Petrobaltic Gdańsk

source: https://lotos.pl

Scope of work:

1. Complete works providing mechanical completion of the Production Centre enabling to proceed to full commissioning of process plants / shipyard phase and full offshore scope including, among others but not limited to:

  • Electrical and automation works related to the transfer of the seawater injection system from the LOTOS Petrobaltic Platform to the Production Centre,
  • All electrical and automation scope work on the head deck,
  • Relocation of the BAKER HUGHES submersible pump supply system.

2. Commissioning management and implementation services, among others:

  • Seawater injection system,
  • Participation in the commissioning of BAKER HUGHES submersible pumps,
  • Participation in the commissioning of SGT-300 gas turbine,,
  • Utility systems,
  • Implementation of loop-check for DCS, ESD, ECS higher-level systems,
  • Full commissioning of heating systems,
  • Verification and calibration of transducers,
  • Preparation for commissioning of the gas compression system.

  

Gdańsk Refinery – the LOTOS Group

source: https://app.xyzgcm.pl/gdansk-pl/t/201802103818.jpg

Scope of work:

- Construction of 110kV cable line
- Installation of cable routes, lightning protection installations, earthing for the construction of the GPZ4/S41/TIR facility

 

Kosakowo Underground Gas Storage

source: https://www.kierunekchemia.pl

Scope of work:

- Construction of an automation system for brine collection  
- Carrying out electrical works
- Carrying out electrical measurements, ICA, external lighting inspections and repairs

 

PGE Energia Ciepła S.A. – Gdynia Combined Heat and Power Plant

source: https://pgeenergiaciepla.pl/spolki-i-oddzialy/elektrocieplownie/pge-energia-ciepla-oddzial-wybrzeze/pge-energia-ciepla-oddzial-wybrzeze

Scope of work:
- Construction of SNCR systems for two BC-50 K6 and K7 boilers BC-50 K6 i K7 (SBB). (urea unloading, ignition burners and DeNox systems).
- Connection work for MASTER system cabinets and equipment accompanying the modification of the control room (IASE).
- Roboty montażowe w Assembly works for the task "CDC EC3 system migration” (IASE).
Modernisation of the biomass control, visualisation, and accounting system.
- Wykonanie systemu wczesnej detekcji pożarów na zasobnikach węgla – ADICOS.
- Implementation of a thermal imaging temperature monitoring system.
- Modernisation of overflow signalling from the service water tank.
- Implementation of an early fire detection system on coal bunkers – ADICOS.
- Modernisation of the internal heating section (OPS7 pump), electrical works and ICA.
- Maintenance of IT hardware infrastructure.
- Modernisation of ICA and control systems of non-unit (auxiliary) systems.
- Modernization of B and D type pumps (ONC1, ONC3, OPS4), electrical works and ICA.
- Installation works related to modernization of electrostatic precipitators - K6 boiler.
- Overhaul of ICA of coal mills, boiler K7 - mills MW2 and MW3.

 

PGE Energia Ciepła S.A. – Gdańsk Combined Heat and Power Plant

 

source: https://pgeenergiaciepla.pl/spolki-i-oddzialy/elektrocieplownie/pge-energia-ciepla-oddzial-wybrzeze/pge-energia-ciepla-oddzial-wybrzeze

Scope of work:
- ICA assembly works for the Wet Flue Gas Desulphurisation System for steam boilers.
- Implementation of a control system for filling the boiler side bunkers.
- Maintenance of IT hardware infrastructure.

PGE Energia Odnawialna S.A. – Żarnowiec Hydroelectric Power Plan Division in Czymanowo

source: https://pgeeo.pl/aktualnosci/PGE-Energia-Odnawialna-zorganizowala-uczniom-obchody-Swiatowego-Dnia-Wody-w-elektrowni-Zarnowiec

Scope of work:

- Żarnowiec pumped storage power plant - Replacement of power cables for electrical cabinets on the crest of the upper reservoir along with the laying of telecommunications ducting.
- Connection of a by-pass valve for HZ-3 butterfly flap.
- Żarnowiec pumped storage power plant - Modernisation of drainage pumping stations 1 and 2.
- Żarnowiec pumped storage power plant - Control system for extinguishing of step-up transformers.

 

Kozienice Power Plant

source: https://energia.rp.pl/energetyka-zawodowa/20230-elektrownia-kozienice-przejdzie-na-gaz

Scope of work:

- Modernisation of the coal feed system in the area of control (coal belt conveyors)

 

ENERGA Gdańsk

source: https://media.energa.pl

Scope of work:

- MV and LV cable and overhead lines, transformer stations, power connections, MV and LV power conflicts in the area of Energa Gdańsk resources

 

Wind Farms

Scope of work:

– WICKO WIND FARM 40MW30kV cable lines with optical fibre ducting – WICKO WIND FARM 40MW
- 30kV cable lines with optical fibre ducting – Lotnisko WF 20MW
30kV cable lines with optical fibre ducting – Radzyń Chełmiński WF 39MW
- Telecommunication installations CCTV, Intrusion Alarm System, Fire Alarm System – Skoczykłody WF 36MW

 

 IKEA Polska

source: https://www.ikea.com/pl/pl/

Scope of work:

- Construction of internal electrical systems for the IKEA building in Łódź
- Construction of internal and external electrical systems including low-current systems for extension of the IKEA site in Gdańsk

 

Morski Park Handlowy Gdańsk – Shopping Center

source: https://www.propertynews.pl

Scope of work:

- Performing electrical and telecommunication works for JULA store
- Performing electrical and telecommunication systems for the construction of Gdańsk Retail Park